Liftech was retained by China Shipping to provide engineering services to procure four dockside cranes. Liftech prepared the technical specifications, assisted with the structural design of the cranes, and reviewed crane design, manufacturing, and commissioning.
The cranes came fully erected, though the A-frames were collapsed to clear the Vincent Thomas Bridge near the terminal.
Reference:
Marine Terminals Corporation
Oakland, California, USA