The City of Alameda and Alameda Point Partners added a ferry terminal at the Seaplane Lagoon in Alameda. The terminal is compatible with the Water Emergency Transportation Authority ferries and operations.
Liftech provided engineering services for design of the new steel float including float structure and deck supports on the float for components that attach to the float, such as access platforms, ramps, stairs, ship ladders, guide pile collars, bitts, fixed and up-and-out ladders, interior ladders, gangway support yoke, and deck hatches.
Liftech assisted the contractor with obtaining a building permit, providing design support, and providing construction support services.
Contractor:
Power Engineering Construction Company
Alameda, California, USA