Liftech worked with Manson Construction Company as part of their design-build team to design the 426 foot long wharf and access bridges; a 955 foot long sheet pile sea wall, mooring platforms, and walkways; and longshoreman building for the Port of Redwood City. The moment frame and thin deck of the wharf structure limit the seismic forces and number of piles required. The project was over a million dollars below budget and was completed months ahead of schedule.