by Erik Soderberg and Michael Jordan
Presented by Erik Soderberg at the AAPA Port Facilities Engineering Conference, January 2006
This presentation discusses emerging tandem 40 dual hoist systems being developed to reduce the vessel time at the berth, and addresses some considerations at the crane-yard interface.